Production equipment

Production equipment

The company has production equipment such as glass extruder, glass green sintering furnace, chain sintering furnace, chain oxidation furnace, sandblasting machine, automatic welding machine, electric lock wire, etc., which can meet the requirements of different customers for production technology.

Testing equipment

Testing equipment

In order to prevent the occurrence and outflow of defective products, the company is equipped with multiple automatic four- dimensional inspection packaging machines, insulation withstand voltage testers, helium mass spectrometer leak detectors, projectors, high-power microscopes, tensile testers, coating thickness gauges, helium gas The density detector, constant temperature and humidity box, salt spray tester, and waiting test equipment ensure the performance and quality of high-standard qualified products.

Production technology

Production technology

The company has glass powder customization and extrusion molding, surface chemical treatment of metal matrix and metal guide pin, controllable high temperature atmosphere furnace, multi metal advanced wire rod with thousand pin and pipe, various pin configuration, metal and alloy body and shell material, chemical lock, resistance welding, electrical test (insulation and high voltage), etc.

Quality control

Quality control

The company has a perfect quality management system. It passed ISO9001 quality system certification in 2007, TS16949:2009 system certification in 2016, iso9001:2015, iso14001:2015 and iatf16949:2016 system upgrade certification in 2018. Starting from the quality management system, the company implements comprehensive quality management and is committed to providing customers with high cost-effective products. The products have passed UL safety certification To ensure the safety and reliability of the product in the customer's terminal application.

Warehouse reserve

Warehouse reserve

§The warehouse has a quantitative inventory of product materials to ensure fast delivery to customers.

§All incoming materials in the warehouse must have the manufacturer's inspection certificate and be confirmed again by our professional technicians to ensure that the stored products are 100% qualified.

§Incoming parts shall be registered and recorded in the warehouse, and each part shall be coded in a specified location to ensure the warehouse efficiency and prevent the loss of resources.